An EV charger fitted in Whale Beach, at a price agreed up front. Electrical3 is based in Cromer, minutes from Whale Beach, and fits home chargers across the Northern Beaches every week. Supplied and installed, including GST, with the certificate of compliance.
Every figure is the fixed price we install for, including GST — not a range you find out the truth about later.
| Install type | Price inc GST | What moves it |
|---|---|---|
| Single phase 7.4kW, charger supplied and installed | $1,653 | Based on a 10 metre run from the switchboard. Longer runs are priced by the metre. |
| Charger you already own, installed | from $893 | We confirm the unit suits your supply before we quote it. |
| Three phase, up to 22kW | $2,032 | Needs three phase already at the property, and a car that can accept it. |
| Solar-diverting charger | $2,163 | Only chargers that genuinely divert solar. We will not sell you one that cannot. |
| Surge protection added on the day | $397 single phase $638 three phase | Cheapest while the board is already open, rather than a separate call-out. |
| Switchboard upgrade, if the board has no room | Quoted before we start | Older boards with ceramic fuses and no safety switches. Send a photo and we price it up front. |
Steep driveways and detached garages usually mean a longer sub-main run for an EV charger, which is worth pricing properly rather than guessing.
A small, steep, very exposed pocket. Houses here take the full brunt of the weather off the water, and it shows first on anything mounted outside — light fittings, GPOs, pool and pump isolators. Access is tight and driveways are steep, which matters as much to how a job is planned as the wiring does.
Housing here is older beach houses and weekenders, many timber-framed and set on steep or stepped blocks, and that is what decides the job: where the board sits, how far the car parks from it, and what the supply already carries.

Your charger gets its own way back to the switchboard, on its own RCBO, sized to the supply you actually have. Nothing else shares that circuit.
The route from the board to where the car parks, in conduit, clipped and tidy. You pay for the metres your house needs — a flat allowance is wrong for everybody.
Mounted where you want it, set to your supply, commissioned and tested properly. You get the certificate of compliance and a clean site.
Solar diversion only if the unit really does it, three phase only if the car can take it, and a board with the capacity for either. We answer those before recommending anything.
We install Tesla Wall Connector, Zappi, Wallbox, Ohme, Evnex and other leading brands, and we will fit a charger you have bought yourself once we have confirmed it suits your supply. See the full EV charger page →
A single phase 7.4kW charger supplied and installed is $1,653 including GST, based on a 10 metre run from the switchboard. Fitting a charger you already own starts at $893, three phase is $2,032 and a solar-diverting charger is $2,163. The estimator on our Sydney EV page gives you your own figure in four questions.
Yes. Electrical3 is based in Cromer, minutes from Whale Beach, and EV charger installation is work we do across the Northern Beaches every week. Call John on 0417 297 285.
Steep driveways and detached garages usually mean a longer sub-main run for an EV charger, which is worth pricing properly rather than guessing. A small, steep, very exposed pocket. Houses here take the full brunt of the weather off the water, and it shows first on anything mounted outside — light fittings, GPOs, pool and pump isolators. Access is tight and driveways are steep, which matters as much to how a job is planned as the wiring does.
It depends what is in the board now. Ceramic fuses, no safety switches or no spare ways usually mean an upgrade first. We look at that before pricing the charger, so there is no mid-job surprise.
Not for most people. Single phase at 7.4kW puts back 35 to 50km an hour, so a normal day of driving is replaced overnight. Three phase is worth it only when the property already has it and the car can use it.
Most single phase installs are a single visit, two to four hours, tested and certified before we leave. A long run, board work or a strata building adds time and we tell you that at quoting stage, not on the day.
Rated 5.0 from 20 Google reviews. Read them all on Google.
“Just got my EV wall box installed by John from Electrical3. He had been excellent from the moment he gave the quote right down to the end of Installation. Honest bloke, Professional and Fair price.”